An organization is divided into three separate entities based on geographical region. Which of the following
types of organizational change is this?
A project manager detects low performance from a team member who previously demonstrated to be a highly
skilled asset. The team member explains that being part of two teams is too time consuming. This is a disadvantage of having:
A project manager launched a survey for future end users of a new product under development. The sponsor received the survey results and realized the needs are different than the features currently being developed. The sponsor decided to cancel the project. Which of the following explains why the sponsor made this decision?
A homeowner wants to build a fence. It will take:
A quarter of a day to measure the length of the fence
Half a day to acquire the materials
A quarter of a day to dig holes for the posts
A quarter of a day to set the posts with concrete
Two days for the concrete to dry
While the concrete is drying, the homeowner will spend a quarter of a day cutting the lateral pieces to size, half a day applying the coating to the remaining pieces, and then three days waiting for the coating to dry. It will then take the homeowner one day to assemble the fence. Which of the following is the length of time it will take the homeowner to build the fence?