New Year Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-AP-BD+C Exam Questions and Answers by mikhail

Page: 2 / 19

USGBC LEED-AP-BD+C Exam Overview :

Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Exam Code: LEED-AP-BD+C Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 304 Q&A's Shared By: mikhail
Question 8

What are the three phases within the Integrative Process Credit, Integrative Process?

Options:

A.

Pre-design, Discovery, Design and Construction

B.

Discovery, Design and Construction, Operations and Feedback

C.

Schematic Design, Design and Construction, Operations and Feedback

D.

Design Charrette, Schematic Design, Operations and Feedback

Discussion
Question 9

Where must a building's no-smoking signage be posted?

Options:

A.

Within 10 ft. (3 m) of all building entrances

B.

Within 10 ft. (3 m) of the main building entrance(s)

C.

Within 25 ft. (8 m) of all building entrances

D.

Within 25 ft. (8 m) of the main building entrance(s)

Discussion
Question 10

What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

One

B.

Two

C.

Four

D.

Six

Discussion
Ayra
How these dumps are necessary for passing the certification exam?
Damian Oct 22, 2024
They give you a competitive edge and help you prepare better.
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby Sep 6, 2024
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Ava-Rose
Yes! Cramkey Dumps are amazing I passed my exam…Same these questions were in exam asked.
Ismail Sep 18, 2024
Wow, that sounds really helpful. Thanks, I would definitely consider these dumps for my certification exam.
Ayesha
They are study materials that are designed to help students prepare for exams and certification tests. They are basically a collection of questions and answers that are likely to appear on the test.
Ayden Oct 16, 2024
That sounds interesting. Why are they useful? Planning this week, hopefully help me. Can you give me PDF if you have ?
Miriam
Highly recommended Dumps. 100% authentic and reliable. Passed my exam with wonderful score.
Milan Sep 24, 2024
I see. Thanks for the information. I'll definitely keep Cramkey in mind for my next exam.
Question 11

A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level

Energy Metering, an energy meter must be installed for

Options:

A.

natural gas

B.

hot water at the main service point

C.

nothing, because the flat fee is included as part of the lease

D.

nothing, because the energy source is outside of the project's scope

Discussion
Page: 2 / 19
Title
Questions
Posted

LEED-AP-BD+C
PDF

$36.75  $104.99

LEED-AP-BD+C Testing Engine

$43.75  $124.99

LEED-AP-BD+C PDF + Testing Engine

$57.75  $164.99