Exam Name: | LEED AP Building Design + Construction (LEED AP BD+C) | ||
Exam Code: | LEED-AP-BD+C Dumps | ||
Vendor: | USGBC | Certification: | Leadership in Energy and Environmental Design (LEED) |
Questions: | 269 Q&A's | Shared By: | mikhail |
What are the three phases within the Integrative Process Credit, Integrative Process?
What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?
A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level
Energy Metering, an energy meter must be installed for