Month End Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Page: 1 / 20

Leadership in Energy and Environmental Design (LEED) LEED AP Building Design + Construction (LEED AP BD+C)

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update Jan 29, 2025
Total Questions : 304

To help you prepare for the LEED-AP-BD+C USGBC exam, we are offering free LEED-AP-BD+C USGBC exam questions. All you need to do is sign up, provide your details, and prepare with the free LEED-AP-BD+C practice questions. Once you have done that, you will have access to the entire pool of LEED AP Building Design + Construction (LEED AP BD+C) LEED-AP-BD+C test questions which will help you better prepare for the exam. Additionally, you can also find a range of LEED AP Building Design + Construction (LEED AP BD+C) resources online to help you better understand the topics covered on the exam, such as LEED AP Building Design + Construction (LEED AP BD+C) LEED-AP-BD+C video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic USGBC LEED-AP-BD+C exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 2

A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

Options:

A.  

12,500 ft2 (1 160 m2)

B.  

15,000 ft2 (1 400 m2)

C.  

25,000 ft2 (2 300 m2)

D.  

35,000 ft2 (3 250 m2)

Discussion 0
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Oct 29, 2024
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Erik
Hey, I have passed my exam using Cramkey Dumps?
Freyja Oct 17, 2024
Really, what are they? All come in your pool? Please give me more details, I am going to have access their subscription. Please brother, give me more details.
Sam
Can I get help from these dumps and their support team for preparing my exam?
Audrey Aug 29, 2024
Definitely, you won't regret it. They've helped so many people pass their exams and I'm sure they'll help you too. Good luck with your studies!
Nadia
Why these dumps are important? Can I pass my exam without these dumps?
Julian Oct 22, 2024
The questions in the Cramkey dumps are explained in detail and there are also study notes and reference materials provided. This made it easier for me to understand the concepts and retain the information better.
Questions 3

Which of the following is true regarding LEED Pilot Credits?

Options:

A.  

Pilot Credits are not specific to the rating systems

B.  

Pilot Credits can be attempted in the design review stage only

C.  

A registered Pilot Credit must be replaced on the LEED project's scorecard if that pilot credit is removed from the Pilot Credit Library

D.  

Pilot Credit feedback surveys must be completed

Discussion 0
Questions 4

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

Options:

A.  

$75

B.  

$150

C.  

$750

D.  

$1,500

Discussion 0
Questions 5

What requirement must be met when creating a Demand Response Program that satisfies Energy and Atmosphere Credit, Demand Response?

Options:

A.  

Permanently reduce the energy consumption in the building by 5%

B.  

Demonstrate submetering of the two highest electrical end uses

C.  

Demonstrate a load shift reduction of 5% in the building

D.  

Create a comprehensive plan for meeting a demand response event

Discussion 0
Title
Questions
Posted

LEED-AP-BD+C
PDF

$36.75  $104.99

LEED-AP-BD+C Testing Engine

$43.75  $124.99

LEED-AP-BD+C PDF + Testing Engine

$57.75  $164.99