Question 48

During the early design phase of a new commercial office building, what action should the project team take to reduce the Global Warming Potential (GWP) of refrigerants?

Options:

A.

Select an HVAC system that uses refrigerants with a GWP of 700 or less

B.

Delay addressing refrigerant concerns until the commissioning phase, when system performance can be evaluated

C.

Specify any HVAC system and offset refrigerant emissions through carbon credits later, if needed

Discussion
Stefan
Thank you so much Cramkey I passed my exam today due to your highly up to date dumps.
Ocean Sep 8, 2026
Agree….Cramkey Dumps are constantly updated based on changes in the exams. They also have a team of experts who regularly review the materials to ensure their accuracy and relevance. This way, you can be sure you're studying the most up-to-date information available.
Marley
Hey, I heard the good news. I passed the certification exam!
Jaxson Aug 31, 2026
Yes, I passed too! And I have to say, I couldn't have done it without Cramkey Dumps.
Rosalie
I passed. I would like to tell all students that they should definitely give Cramkey Dumps a try.
Maja Sep 6, 2026
That sounds great. I'll definitely check them out. Thanks for the suggestion!
Neve
Will I be able to achieve success after using these dumps?
Rohan Sep 25, 2026
Absolutely. It's a great way to increase your chances of success.
Cecilia
Yes, I passed my certification exam using Cramkey Dumps.
Helena Sep 5, 2026
Great. Yes they are really effective
Question 49

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:

Options:

A.

All luminaires have full cutoff fixtures

B.

All luminaires are mounted at least three mounting heights from the lighting boundary

C.

All luminaires have a minimum color temperature of 3500 K

D.

All luminaires meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

Discussion
Question 50

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

Options:

A.

Develop the building energy model

B.

Optimize the green strategies across all aspects

C.

Calculate the life cycle cost of the building

D.

Choose an appropriate Commissioning Authority (CxA)

Discussion
Question 51

Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

Options:

A.

Install an on-site photovoltaic array

B.

Purchase Green-e certified carbon offsets

C.

Purchase Green-e certified Renewable Energy Certificates (RECs)

D.

Install a ground-source heat pump

Discussion
Page: 12 / 32
Title
Questions
Posted

LEED-AP-BD+C
PDF

$36.75  $104.99

LEED-AP-BD+C Testing Engine

$43.75  $124.99

LEED-AP-BD+C PDF + Testing Engine

$57.75  $164.99