Question 104

Which of the following statements about estimation of the test effort is WRONG?

Options:

A.

Effort estimate can be inaccurate because the quality of the product under tests is not known.

B.

Once the test effort is estimated, resources can be identified and a schedule can be drawn up.

C.

Experience based estimation is one of the estimation techniques.

D.

Effort estimate depends on the budget of the project.

Discussion
Nia
Why are these Dumps so important for students these days?
Mary Oct 9, 2024
With the constantly changing technology and advancements in the industry, it's important for students to have access to accurate and valid study material. Cramkey Dumps provide just that. They are constantly updated to reflect the latest changes and ensure that the information is up-to-date.
Pippa
I was so happy to see that almost all the questions on the exam were exactly what I found in their Dumps.
Anastasia Sep 21, 2024
You are right…It was amazing! The Cramkey Dumps were so comprehensive and well-organized, it made studying for the exam a breeze.
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Oct 25, 2024
Good point. Thanks for the advice. I'll definitely keep that in mind.
Ernest
That's amazing. I think I'm going to give Cramkey Dumps a try for my next exam. Thanks for telling me about them! CramKey admin please share more questions……You guys are amazing.
Nate Sep 15, 2024
I failed last week, I never know this site , but amazed to see all these questions were in my exam week before. I feel bad now, why I didn’t bother this site. Thanks Cramkey, Excellent Job.
Question 105

Tests have been specified for the latest software release and users have prioritised these

However, there are some dependencies between tests as shown in the table below (e.g. Test ID. X cannot be run until Test ID. Y has been successfully completed).

Which test execution schedule best meets the prioritisation and dependency conditions?

Options:

A.

5,2,3,4 1

B.

1,5,3,1,2.

C.

1,2,3,4,5

D.

5,1,2,3,4

Discussion
Question 106

Which of the following are the phases of the ISTQB fundamental test process?

Options:

A.

Test planning. Test analysis and design. Test implementation and control, Checking test coverage and reporting. Test closure activities

B.

Test planning and control. Test specification and design. Test implementation and execution. Evaluating test coverage and reporting. Retesting and regression testing, Test closure activities

C.

Test planning and control. Test analysis and design, Test implementation and execution, Evaluating exit criteria and reporting, Test closure activities

D.

Test planning, Test specification and design, Test implementation and execution, Evaluating exit criteria and reporting, Retesting and test closure activities

Discussion
Question 107

Which of the following statements about test execution effort is true?

Options:

A.

An increase in number of testers always reduces testing time.

B.

A large number of test repetitions mean less test execution effort.

C.

The test execution effort is independent of the number of test environments.

D.

The test case execution effort is dependent on the build quality.

Discussion