Special Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Huawei Updated H12-821_V1.0 Exam Questions and Answers by faye

Page: 10 / 22

Huawei H12-821_V1.0 Exam Overview :

Exam Name: HCIP-Datacom-Core Technology V1.0
Exam Code: H12-821_V1.0 Dumps
Vendor: Huawei Certification: HCIP-Datacom
Questions: 299 Q&A's Shared By: faye
Question 40

In PIM-DM, which of the following processes are involved in SPT establishment?

Options:

A.

Prune

B.

Graft

C.

Flooding

D.

State-refresh

Discussion
Osian
Dumps are fantastic! I recently passed my certification exam using these dumps and I must say, they are 100% valid.
Azaan Aug 8, 2024
They are incredibly accurate and valid. I felt confident going into my exam because the dumps covered all the important topics and the questions were very similar to what I saw on the actual exam. The team of experts behind Cramkey Dumps make sure the information is relevant and up-to-date.
Andrew
Are these dumps helpful?
Jeremiah Oct 27, 2024
Yes, Don’t worry!!! I'm confident you'll find them to be just as helpful as I did. Good luck with your exam!
Laila
They're such a great resource for anyone who wants to improve their exam results. I used these dumps and passed my exam!! Happy customer, always prefer. Yes, same questions as above I know you guys are perfect.
Keira Aug 12, 2024
100% right….And they're so affordable too. It's amazing how much value you get for the price.
Vienna
I highly recommend them. They are offering exact questions that we need to prepare our exam.
Jensen Oct 9, 2024
That's great. I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Question 41

Which of the following statements about BFD operating modes are true?

Options:

A.

In demand mode, once a BFD session is set up, the system no longer periodically sends BFD Control packets.

B.

Asynchronous mode does not support the Echo function.

C.

In asynchronous mode, two systems periodically exchange BFD Control packets at the negotiated interval. If one system does not receive any BFD Control packets from the other within the detection time, the BFD session is declared down.

D.

Asynchronous mode is the primary BFD operating mode.

Discussion
Question 42

R1, R2, R3, and R4 run IS-IS, and the DIS priorities of their interfaces are shown in the following figure. If all these devices are started simultaneously, will be elected as the DIS. (Enter the device name, for example, R1.)Questions 42

Options:

Discussion
Question 43

On an IS-IS network, each device needs to be configured with a network entity title (NET), which consists of three parts, each containing different fields. Which of the following fields are contained in the Area Address part?

Options:

A.

High Order DSP

B.

AFI

C.

IDI

D.

System ID

Discussion
Page: 10 / 22
Title
Questions
Posted

H12-821_V1.0
PDF

$36.75  $104.99

H12-821_V1.0 Testing Engine

$43.75  $124.99

H12-821_V1.0 PDF + Testing Engine

$57.75  $164.99