| Exam Name: | Implementing and Administering Cisco Solutions (200-301 CCNA) v1.1 | ||
| Exam Code: | 200-301 Dumps | ||
| Vendor: | Cisco | Certification: | CCNA |
| Questions: | 1197 Q&A's | Shared By: | sunny |
Drag and drop the characteristic from the left onto the IPv6 address type on the right.
Drag and drop the AAA features from the left onto the corresponding AAA security services on the right. Not all options are used.
The address block 192 168 32 0/24 must be subnetted into smaller networks The engineer must meet these requirements
• Create 8 new subnets
• Each subnet must accommodate 30 hosts
• Interface VLAN 10 must use the last usable IP in the first new subnet
• A Layer 3 interface is used
Which configuration must be applied to the interface?
A)
B)
C)
D)
A HCP pool has been created with the name CONTROL. The pool uses the next to last usable IP address as the default gateway for the DHCP clients. The server is located at 172.16 32.15. What is the step in the process for clients on the 192.168.52.0/24 subnet to reach the DHCP server?