Exam Name: | VMware vSphere 8.x Advanced Design | ||
Exam Code: | 3V0-21.23 Dumps | ||
Vendor: | VMware | Certification: | VMware Certification |
Questions: | 92 Q&A's | Shared By: | maddie |
A company has a requirement that all production applications must have a maximum tolerable downtime (MTD) of one hour per month.
Which statement would be included in the conceptual design to support this requirement?
An architect is designing a vSphere-based application hosting solution in a brownfield site.
The following information has been provided during the requirements gathering workshop:
The solution should support 5,000 compute workloads across two physical sites.
The CFO has approved budget for the purchase of new server and network hardware only.
The existing storage array is currently Fibre Channel connected with 2 x 8 Gbps interfaces to a dedicated Storage Area Network (SAN) fabric.
The existing storage array does not support integration with vSphere API for Storage Awareness.
The existing storage array can be configured to support NFS storage.
The existing vSphere administration team will responsible for operational management of the new solution.
Which storage technology should the architect recommend based on these requirements?
An architect is tasked with devising a vSphere design strategy that will allow the company to quickly scale global data center functionality when a new location is identified.
The following requirements must be met:
The solution must include VMware licensing costs.
The design must keep data locally to each specific location.
The design must utilize current company processes around vSphere.
Any new global location must be functional within one month of identification.
Which design strategy will meet these requirements?
An architect will be updating an existing vSphere data center design.
The following information has been provided:
The new design must carry over existing VLANs for workloads.
The networking for storage must not share the data path with workload traffic.
The new design must be able to add additional VLANS.
The new design must reduce management overhead.
The new replacement servers have two 100 GB network cards.
Which design will meet the requirements for existing workload networks and allow scaling of additional networks?