Exam Name: | VMware vSphere 8.x Advanced Design | ||
Exam Code: | 3V0-21.23 Dumps | ||
Vendor: | VMware | Certification: | VMware Certification |
Questions: | 92 Q&A's | Shared By: | lainey |
An architect is documenting the design for a new multi-site vSphere solution. The customer has informed the architect that the workloads hosted on the solution are managed by application teams, who must perform a number of steps to return the application to service following a failover of the workloads to the secondary site. These steps are defined as the Work Recovery Time (WRT). The customer has provided the architect with the following information about the workloads:
Critical workloads have a WRT of 12 hours
Production workloads have a WRT of 24 hours
Development workloads have a WRT of 24 hours
All workloads have an RPO of 4 hours
Critical workloads have an RTO of 1 hour
Production workloads have an RTO of 12 hours
Development workloads have an RTO of 24 hours
The customer has also confirmed that the Disaster Recovery solution will not begin the recovery of the development workloads until all critical and production workloads have been recovered at the secondary site.
What would the architect document as the maximum tolerable downtime (MTD) for each type of workload in the design?
An architect is designing a new vSphere solution. The following information has been gathered during the design workshops with the customer:
The solution will be deployed into two availability zones (AZs)
The solution will be configured as a single stretched cluster with shared storage across the two AZs
Production and Development workloads will run across both AZs
The cluster is configured as N + 1
The architect needs to ensure that, in the event of a host failure during maintenance of another host in the cluster, only the Production workloads are recovered.
What should the architect include in the design to meet this requirement?
An architect is designing a new vSphere-based solution for a customer.
During a requirements gathering workshop, the following information is provided:
The solutions must provide a recovery point objective (RPO) of 15 minutes.
The solution must have a primary and secondary site.
The solution must support orchestration to address application dependencies.
Which two solutions should the architect include in the design to meet these requirements? (Choose two.)
An architect is tasked with creating a design for a vSphere-based solution.
Reviewing requirements with the security team, the architect makes the following design decision:
ESXi hosts in the environment will enable shell sandbox for SSH connections and the local ESXi shell
What is an implication of the design decision to enable shell sandboxing?