Question 20

Which of the following statements is correct when defining the project boundary?

Options:

A.

The project boundary must be defined by the limit of construction

B.

The LEED project boundary cannot include more than one building

C.

The gross floor area of the LEED project should be no less than 1,000 ft2 (93 m2)

D.

Contiguous land that is associated with the project that is altered as a result of construction must be included

Discussion
Question 21

A project team is implementing a strategy that controls the admission of natural light into the office space being developed. To which credit can this contribute?

Options:

A.

Indoor Environmental Quality Credit, Interior Lighting

B.

Indoor Environmental Quality Credit, Thermal Comfort

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Optimize Energy Performance

Discussion
Question 22

In a goal-setting workshop, a decision is made to place circulation at the exterior of the office perimeter next to the window wall. Which of the following is an example of integrated decision-making?

Options:

A.

Installing blinds to increase occupant comfort

B.

Darkening the color of the carpet along the perimeter to aid way-finding

C.

Lowering the heating set-point in the circulation space to conserve energy

D.

Issuing user guidelines which limit the height of occupant additions to cubicles along the perimeter

Discussion
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Oct 25, 2024
Good point. Thanks for the advice. I'll definitely keep that in mind.
Walter
Yayyy!!! I passed my exam with the help of Cramkey Dumps. Highly appreciated!!!!
Angus Nov 4, 2024
YES….. I saw the same questions in the exam.
Conor
I recently used these dumps for my exam and I must say, I was impressed with their authentic material.
Yunus Sep 13, 2024
Exactly…….The information in the dumps is so authentic and up-to-date. Plus, the questions are very similar to what you'll see on the actual exam. I felt confident going into the exam because I had studied using Cramkey Dumps.
Zayaan
Successfully aced the exam… Thanks a lot for providing amazing Exam Dumps.
Harmony Sep 10, 2024
That's fantastic! I'm glad to hear that their dumps helped you. I also used them and found it accurate.
Alessia
Amazing Dumps. Found almost all questions in actual exam whih I prepared from these valuable dumps. Recommended!!!!
Belle Nov 2, 2024
That's impressive. I've been struggling with finding good study material for my certification. Maybe I should give Cramkey Dumps a try.
Question 23

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in a shared office restroom

B.

A sink in a private office bathroom

C.

A sink in a private hotel room bathroom

D.

A sink in an employee restroom in a retail store

Discussion