Weekend Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-AP-ID+C Exam Questions and Answers by keanu

Page: 5 / 7

USGBC LEED-AP-ID+C Exam Overview :

Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Exam Code: LEED-AP-ID+C Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 100 Q&A's Shared By: keanu
Question 20

Which of the following statements is correct when defining the project boundary?

Options:

A.

The project boundary must be defined by the limit of construction

B.

The LEED project boundary cannot include more than one building

C.

The gross floor area of the LEED project should be no less than 1,000 ft2 (93 m2)

D.

Contiguous land that is associated with the project that is altered as a result of construction must be included

Discussion
Nia
Why are these Dumps so important for students these days?
Mary Oct 9, 2024
With the constantly changing technology and advancements in the industry, it's important for students to have access to accurate and valid study material. Cramkey Dumps provide just that. They are constantly updated to reflect the latest changes and ensure that the information is up-to-date.
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline Sep 12, 2024
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Syeda
I passed, Thank you Cramkey for your precious Dumps.
Stella Aug 25, 2024
That's great. I think I'll give Cramkey Dumps a try.
Ace
No problem! I highly recommend Cramkey Dumps to anyone looking to pass their certification exams. They will help you feel confident and prepared on exam day. Good luck!
Harris Oct 31, 2024
That sounds amazing. I'll definitely check them out. Thanks for the recommendation!
Atlas
What are these Dumps? Would anybody please explain it to me.
Reign Aug 14, 2024
These are exam dumps for a variety of IT certifications. They have a vast collection of updated questions and answers, which are very helpful in preparing for the exams.
Question 21

A project team is implementing a strategy that controls the admission of natural light into the office space being developed. To which credit can this contribute?

Options:

A.

Indoor Environmental Quality Credit, Interior Lighting

B.

Indoor Environmental Quality Credit, Thermal Comfort

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Optimize Energy Performance

Discussion
Question 22

In a goal-setting workshop, a decision is made to place circulation at the exterior of the office perimeter next to the window wall. Which of the following is an example of integrated decision-making?

Options:

A.

Installing blinds to increase occupant comfort

B.

Darkening the color of the carpet along the perimeter to aid way-finding

C.

Lowering the heating set-point in the circulation space to conserve energy

D.

Issuing user guidelines which limit the height of occupant additions to cubicles along the perimeter

Discussion
Question 23

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in a shared office restroom

B.

A sink in a private office bathroom

C.

A sink in a private hotel room bathroom

D.

A sink in an employee restroom in a retail store

Discussion
Page: 5 / 7

LEED-AP-ID+C
PDF

$36.75  $104.99

LEED-AP-ID+C Testing Engine

$43.75  $124.99

LEED-AP-ID+C PDF + Testing Engine

$57.75  $164.99