New Year Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-AP-ID+C Exam Questions and Answers by kareem

Page: 7 / 7

USGBC LEED-AP-ID+C Exam Overview :

Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Exam Code: LEED-AP-ID+C Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 100 Q&A's Shared By: kareem
Question 28

A project has access to two alternative water sources. How should they determine which source to use where?

Options:

A.

A project may not use two alternative water sources

B.

Target the uses that require the least treatment first, such as toilet flushing or irrigation

C.

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.

All sources should be treated to potable water standards and used to supplement the municipal supply

Discussion
Question 29

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

Options:

A.

as part of the discovery phase

B.

as part of the final certification submittal

C.

after the design phase but before construction

D.

after the Commissioning (Cx) review but before design phase submittal

Discussion
Question 30

A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?

Options:

A.

10%

B.

15%

C.

20%

D.

25%

Discussion
Page: 7 / 7

LEED-AP-ID+C
PDF

$36.75  $104.99

LEED-AP-ID+C Testing Engine

$43.75  $124.99

LEED-AP-ID+C PDF + Testing Engine

$57.75  $164.99