Winter Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

Nutanix Updated NCS-Core Exam Questions and Answers by hadiya

Page: 9 / 22

Nutanix NCS-Core Exam Overview :

Exam Name: Nutanix Certified Services Core Infrastructure Professional
Exam Code: NCS-Core Dumps
Vendor: Nutanix Certification: NCS Professional
Questions: 302 Q&A's Shared By: hadiya
Question 36

Refer to the exhibit.

Questions 36

An administrator creates a security policy that isolates their financial application from accessing the Internet When viewing the policy in Prism Central, several connections from the application are outbound to the Internet.

What is causing this issue with the policy?

Options:

A.

The 0.0.0.0 address was not specified in the outbound rule.

B.

The blocked connections are illustrated for information only.

C.

The Activate box was not checked in the rule, so it is not enforcing.

D.

The policy has been left in monitor mode instead of enforcing mode.

Discussion
Question 37

A consultant is completing final network failover testing on a recently deployed AHV cluster.

The cluster consists of the following:

•Three nodes

•Two uplinks connected to two switches

•Supported SFPs

The consultant removed one SFP+ out of each node. Two of the nodes (Hostl I Host2) failed over to the backup NIC correctly without any interruption but have lost communication with the third node (Host 3) hypervisor/CVM. Inserting the original SFP+ back into the problematic node allowed the network to be connected and the two healthy nodes could communicate successfully again.

manage_ovs showjnterfaces output

manage_ovs showjinterfaces output:

name mode link speed

cthO 10000 True 10000

ethl 10000 False None

eth2 10000 True 10000

eth3 10000 False None

manage_ovs show.uplinks output:

Bridge: brO

Bond: brO-up

bond_mode: active-backup

interfaces: ethl ethO

lacp: off

lacp-fa I 1 back: false

lacp_speed: slow

What should the consultant validate first?

Options:

A.

Validate NIC card on node is seated properly.

B.

Validate that the correct interfaces are included in the bridge.

C.

Validate the customer has configured all their switch ports identically.

D.

Validate the SFP+ is fully plugged into the node and switch.

Discussion
Question 38

What is the default password shipped on new NX hardware from the factory for the ADMIN user on IPMI?

Options:

A.

node-serial-number

B.

nutanix/4u

C.

block-serial-number

D.

ADMIN

Discussion
Kylo
What makes Cramkey Dumps so reliable? Please guide.
Sami Aug 29, 2024
Well, for starters, they have a team of experts who are constantly updating their material to reflect the latest changes in the industry. Plus, they have a huge database of questions and answers, which makes it easy to study and prepare for the exam.
Pippa
I was so happy to see that almost all the questions on the exam were exactly what I found in their Dumps.
Anastasia Sep 21, 2024
You are right…It was amazing! The Cramkey Dumps were so comprehensive and well-organized, it made studying for the exam a breeze.
Laila
They're such a great resource for anyone who wants to improve their exam results. I used these dumps and passed my exam!! Happy customer, always prefer. Yes, same questions as above I know you guys are perfect.
Keira Aug 12, 2024
100% right….And they're so affordable too. It's amazing how much value you get for the price.
Walter
Yayyy!!! I passed my exam with the help of Cramkey Dumps. Highly appreciated!!!!
Angus Nov 4, 2024
YES….. I saw the same questions in the exam.
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline Sep 12, 2024
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Question 39

Refer to Exhibit:

Questions 39

A Foundation install must be done on four NX nodes for a new customer. A consultant need to set up the network onsite before imaging the nodes through the Foundation tool.

The nodes are equipped with two SFP28 25GbE NICs with dual ports, and a 10GBase-T NIC with dual ports as well The customer’s ToR switches are 25GbE datacenter switches, already in production.

What is the appropriate hardware to perform the most reliable imaging of these NX nodes?

Options:

A.

A flat Ethernet switch, 4 compatible IGBase-T GBiCs, five Ethernet cables and a laptop.

B.

The 25GbE production switches. 4 DAC cables and 5 Ethernet cables with a flat Ethernet switch, and a laptop.

C.

A flat Ethernet switch. 9 Ethernet cables, and a laptop.

D.

The 25GbE production switches. 4 DAC cables, only one Ethernet cable with a 10GBase-T GBIC, and a laptop.

Discussion
Page: 9 / 22
Title
Questions
Posted

NCS-Core
PDF

$42  $104.99

NCS-Core Testing Engine

$50  $124.99

NCS-Core PDF + Testing Engine

$66  $164.99