Question 80

Over the period of 2 to 3 weeks, a cluster displays the following:

•Periods where Warning Alerts of memory usage over 75% are asserted

•Periods where Critical Warnings of memory usage over 90% are asserted

•Periods of slow of frozen VDI desktops have caused work stoppage or slowdown

•VDI clones have periodically not powered up when called, causing work stoppage

Which steps should be used to prioritize the administrator’s troubleshooting efforts?

Options:

A.

•Assess resource health on Hardware page

•Review the Analysis page for memory usage demand

•Determine the VDI workload-to-host affinity across the cluster

B.

•Analyze Alert Pages for a root cause of memory problem

•Analyze VM table page to access the VM functionality

•Analyze the VDI Clone properties for possible VDI Workload stress

C.

•Check Analysis page for CPU demand

•Verify VDI workload property for memory subscription

•Review the Hardware page to determine if the cluster has sufficient RAM

D.

•Review Analysis Page for memory use pattern

•Alert with VDI workload demand

•Analyze current and future workload in the Capacity Runaway tab for sufficient resources

Discussion
Question 81

An administrator needs to create and start five new VMs for a Data Analytics Project (OLAP). The VM Profile is as follows:

• vCPU:4

• vRAM: 64 GB

• vDisk: 1.5 TB

Each of the four nodes of the Nutanix cluster has the following:

• 24 vCPU. 20% overall usage

• 192 GB RAM, 60% overall usage

• 2xl920GBSSD

• 4x 2 TB HDD

At cluster level, there is a single RF2 container that is 30% utilized and has an extent store capacity of 13.5 TB.

Which component requires administrator attention?

Options:

A.

Physical RAM, because it is not enough to power on all of the new VMs.

B.

Physical Cores, because they are not enough to power on all of the new VMs.

C.

Storage, because the capacity is not enough to create VMs.

D.

Flash Tier because it is not enough to accommodate the workloads.

Discussion
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub Sep 22, 2024
That's great to hear. I am going to try them soon.
Ilyas
Definitely. I felt much more confident and prepared because of the Cramkey Dumps. I was able to answer most of the questions with ease and I think that helped me to score well on the exam.
Saoirse Sep 25, 2024
That's amazing. I'm glad you found something that worked for you. Maybe I should try them out for my next exam.
Teddie
yes, I passed my exam with wonderful score, Accurate and valid dumps.
Isla-Rose Aug 18, 2024
Absolutely! The questions in the dumps were almost identical to the ones that appeared in the actual exam. I was able to answer almost all of them correctly.
Conor
I recently used these dumps for my exam and I must say, I was impressed with their authentic material.
Yunus Sep 13, 2024
Exactly…….The information in the dumps is so authentic and up-to-date. Plus, the questions are very similar to what you'll see on the actual exam. I felt confident going into the exam because I had studied using Cramkey Dumps.
Question 82

A customer already has a Prism Central (PC) instance deployed in their environment and expects the consultant to unregister the old cluster before registering the new cluster

What steps should the consultant take to safely and successfully unregister the customer's former cluster from PC?

Options:

A.

Login to any CVM using SSH and use the multicluster command found within NCLi, followed by the unregistration_cleanup.py script on PE and PC.

B.

Login to the PC Web UI, locate the PE cluster and click Unregister from the Actions dropdown menu.

C.

Login to any PCVM using SSH and run the PE_unreglster.py script located in the Nutanix scripts directory, followed by the unregistratlon_cleanup.py script

D.

Login to the PC Web Ul, navigate to Cluster Registrations found under settings in the Admin Center, check the box next to the desired PE. and click Remove

Discussion
Question 83

A consultant successfully completes a Foundation using a flat switch. The consultant then works with the customer to move the cluster over to their production network. After the move, the CVMs and hypervisors can no longer communicate, which prevents the cluster from starting.

Which option should be used to resolve this issue?

Options:

A.

If the IPMI is in use, check that the IPMI can ping the default gateway over IPv6.

B.

Make sure that the IPMI and CVM VLAN is manually tagged on the Host and CVM.

C.

Verify that IPv6 Link Local and DHCP is enabled on all switch ports.

D.

If using VLANs, confirm the hypervisor/CVM VLAN is set as Native on the switch ports.