Exam Name: | ISTQB Certified Tester Foundation Level (CTFL v4.0) | ||
Exam Code: | ISTQB-CTFL Dumps | ||
Vendor: | ISTQB | Certification: | Foundation Level |
Questions: | 399 Q&A's | Shared By: | winifred |
Which of the following statements is true?
During system testing phase of a word processor, a tester finds that on opening a file from a particular set of files, which are part of a critical workflow, the word processor crashes. Which of the following is the next step the tester should take poor to recording the deviation?
The following chart represents metrics related to testing of a project that was competed. Indicate what is represented by tie lines A, B and the axes X.Y
A)
B)
C)
D)
A system has a self-diagnostics module that starts executing after the system is reset. The diagnostics are running 12 different tests on the systems memory hardware. The following is one of the requirements set for the diagnostics module:
'The time taking the diagnostics tests to execute shall be less than 2 seconds' Which of the following is a failure related to the specified requirement?