Black Friday Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

ISTQB Updated ATM Exam Questions and Answers by wynter-rose

Page: 2 / 2

ISTQB ATM Exam Overview :

Exam Name: ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]
Exam Code: ATM Dumps
Vendor: ISTQB Certification: ISTQB Test Manager
Questions: 64 Q&A's Shared By: wynter-rose
Question 8

A chart showing the trend in the lag time from defect reporting to resolution during system testing is also available. The chart shows that the daily closure period is consistently and significantly above the rolling closure period for a long period of the system testing phase.

Almost all defects found during system testing have been related to the system as a whole, not related to single units or integrations issues. Almost all quality risks have been addressed during the unit and integration testing phase and no residual quality risks were present in the integrated system. This has been confirmed by exploratory testing sessions performed during system testing, targeted at finding defects in these quality risk areas.

Based on the given information only, which one of the following areas would you expect to be considered more in the retrospective meeting in order to be improved?

K3 3 credits

Options:

A.

The requirements review

B.

The defect management process

C.

The quality risk analysis process

D.

The system design and architecture design reviews

Discussion
Stefan
Thank you so much Cramkey I passed my exam today due to your highly up to date dumps.
Ocean Aug 31, 2024
Agree….Cramkey Dumps are constantly updated based on changes in the exams. They also have a team of experts who regularly review the materials to ensure their accuracy and relevance. This way, you can be sure you're studying the most up-to-date information available.
Alaia
These Dumps are amazing! I used them to study for my recent exam and I passed with flying colors. The information in the dumps is so valid and up-to-date. Thanks a lot!!!
Zofia Sep 9, 2024
That's great to hear! I've been struggling to find good study material for my exam. I will ty it for sure.
Anya
I must say they're considered the best dumps available and the questions are very similar to what you'll see in the actual exam. Recommended!!!
Cassius Nov 2, 2024
Yes, they offer a 100% success guarantee. And many students who have used them have reported passing their exams with flying colors.
Ernest
That's amazing. I think I'm going to give Cramkey Dumps a try for my next exam. Thanks for telling me about them! CramKey admin please share more questions……You guys are amazing.
Nate Sep 15, 2024
I failed last week, I never know this site , but amazed to see all these questions were in my exam week before. I feel bad now, why I didn’t bother this site. Thanks Cramkey, Excellent Job.
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari Sep 1, 2024
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Question 9

You are managing the system testing for a SOA based system. The integrated system consists of several subsystems:

- A SOA middleware

- A CRM (Customer Relationship Management) system

- A BRM (Billing and Revenue Management) system

- A SMS (Subscriber Management System) system and you performed a risk analysis based on these subsystems.

Questions 9

At the end of the scheduled period for test execution you produce a first classical report based on the traditional metrics of testing. Test pass/fail status and bug status (open/resolved) That table provides you a distorted picture of the quality risk, because there is no indication of the risk level of the failed tests, the tests not run, or the open bugs. Thus, you produce the following table to solve this distortion issue:

In the table above, where you have introduced the concept of risk weighting, the highest risk test or bug report has a score of 1, while the lowest risk test or bug report has a score of 0.04.

Which of the following subsystems, based on the risk scores of the table, is most risky?

K4 3 credits

Options:

A.

SOA

B.

CRM

C.

BRM

D.

SMS

Discussion
Page: 2 / 2

ATM
PDF

$36.75  $104.99

ATM Testing Engine

$43.75  $124.99

ATM PDF + Testing Engine

$57.75  $164.99