Question 8

Which formula is correct?

Options:

A.

Phase-to-Neutral Voltage = Phase-to-Phase voltage * 1.732

B.

Phase-to-Neutral Voltage = Phase-to-Phase voltage /1.732

C.

Phase-to-Neutral Voltage = Phase-to-Neutral voltage * 1.732

D.

Phase-to-Neutral Voltage = (Phase-to-Phase voltage * 1.732) / Phase-to-Neutral Voltage

Discussion
Question 9

An MCB needs to be installed in the PDU of an air-conditioner unit.

Which breaking curve should you select?

Options:

A.

D-Curve

B.

C-Curve

C.

B-Curve

D.

A-Curve

Discussion
Question 10

When shielding material reaches its saturation point, what will be the impact?

Options:

A.

The shielding material will reach its optimal shielding performance state.

B.

The shielding material will no longer be able to attenuate (reduce) additional EMF.

C.

The shielding material will increase its permeability factor.

D.

The shielding material will reach its maximum electrically charged state.

Discussion
Georgina
I used Cramkey Dumps to prepare for my recent exam and I have to say, they were a huge help.
Corey (not set)
Really? How did they help you? I know these are the same questions appears in exam. I will give my try. But tell me if they also help in some training?
Kingsley
Do anyone guide my how these dumps would be helpful for new students like me?
Haris (not set)
Absolutely! They are highly recommended for anyone looking to pass their certification exam. The dumps are easy to understand and follow, making it easier for you to study and retain the information.
Melody
My experience with Cramkey was great! I was surprised to see that many of the questions in my exam appeared in the Cramkey dumps.
Colby (not set)
Yes, In fact, I got a score of above 85%. And I attribute a lot of my success to Cramkey's dumps.
Stefan
Thank you so much Cramkey I passed my exam today due to your highly up to date dumps.
Ocean (not set)
Agree….Cramkey Dumps are constantly updated based on changes in the exams. They also have a team of experts who regularly review the materials to ensure their accuracy and relevance. This way, you can be sure you're studying the most up-to-date information available.
Norah
Cramkey is highly recommended.
Zayan (not set)
Definitely. If you're looking for a reliable and effective study resource, look no further than Cramkey Dumps. They're simply wonderful!
Question 11

The UPS of a data center, with an ANSI/TIA-942 Rating-4, is installed with the rectifier connected to power feed A and the bypass/reserve line input connected to power feed B.

To which feed will the output of the UPS be synchronized?

Options:

A.

The UPS will not synchronize to any of the feeds but use an internal clock to set the output voltage and frequency

B.

Depends on the setting of the UPS, as the UPS can normally be set to either feed

C.

Feed A

D.

Feed B