Exam Name: | Implementing Cisco Data Center Core Technologies (350-601 DCCOR) | ||
Exam Code: | 350-601 Dumps | ||
Vendor: | Cisco | Certification: | CCNP Data Center |
Questions: | 489 Q&A's | Shared By: | dilan |
A customer reports Fibre Channel login requests to a cisco MDS 9000 series Switch from an unauthorized source. The customer requires a feature that will allow all devices already logged in and learned in and learned to be added to the Fibre channel active database. Which two features must be enabled to accomplish this goal? (Choose two.)
Refer to the exhibit.
An engineer must configure a Fibre Channel device alias named TEST for a device attached to port fc1/9 of a Cisco Nexus Series Switch. Which command set completes the configuration?
A)
B)
C)
D)
A POAP-enabled Cisco Nexus switch will not enter POAP mode. Which two conditions should be verified? (Choose two.)
Which component is disrupted when the cisco integrated Management controller is upgraded on a cisco UCS series server?