Question 12

The performance of a production manager is assessed on efficient use of materials during the production process.

Actual data and data from the fixed budget for Month 4 are as follows:

Questions 12

What figures should be compared in order to assess the production manager's performance for Month 4?

Options:

A.

15,500 kg and 11,000 kg

B.

15,500 kg and 14,000 kg

C.

16,500 kg and 16,000 kg

D.

11,000 kg and 14,000 kg

Discussion
Esmae
I highly recommend Cramkey Dumps to anyone preparing for the certification exam.
Mollie Aug 15, 2024
Absolutely. They really make it easier to study and retain all the important information. I'm so glad I found Cramkey Dumps.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Oct 29, 2024
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Billy
It was like deja vu! I was confident going into the exam because I had already seen those questions before.
Vincent Aug 15, 2024
Definitely. And the best part is, I passed! I feel like all that hard work and preparation paid off. Cramkey is the best resource for all students!!!
Conor
I recently used these dumps for my exam and I must say, I was impressed with their authentic material.
Yunus Sep 13, 2024
Exactly…….The information in the dumps is so authentic and up-to-date. Plus, the questions are very similar to what you'll see on the actual exam. I felt confident going into the exam because I had studied using Cramkey Dumps.
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub Sep 22, 2024
That's great to hear. I am going to try them soon.
Question 13

ABC uses an activity-based costing system.

The company manufactures three products, details of which are given below:

Questions 13

Total material movement costs for the period are $10,000.

The material movement cost per unit for Product Z (to the nearest $0.01) is:

Options:

A.

$10.67

B.

$2.71

C.

$3.23

D.

$7.62

Discussion
Question 14

QR uses an activity based budgeting (ABB) system to budget product costs. It manufactures two products, product Q and product R. The budget details for these two products for the forthcoming period are as follows:

Questions 14

The total budgeted cost of setting up the machines is $74,400.

What was the budgeted machine set up cost per unit of product Q?

Options:

A.

$0.39 per unit

B.

$0.56 per unit

C.

$0.37 per unit

D.

$0.48 per unit

Discussion
Question 15

When classifying quality costs, which of the following is NOT likely to be an appraisal cost?

Options:

A.

Cost of product liability insurance

B.

Cost of supervision of testing and inspection activities

C.

Performance testing costs

D.

Cost of maintaining inspection equipment