New Year Special 75% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 75brite

WELL Updated WELL-AP Exam Questions and Answers by savanna

Page: 8 / 15

WELL WELL-AP Exam Overview :

Exam Name: WELL Accredited Professional (WELL AP) Exam
Exam Code: WELL-AP Dumps
Vendor: WELL Certification: WELL Accredited Professional
Questions: 204 Q&A's Shared By: savanna
Question 32

A company is moving is 1, 500 employees into a new office building, which has lust passed documentation review. The building contractor has handed over the project. And the certificate of occupancy was granted two months ago Currently, 650 employees occupy the building. Which of the following steps should the WELL AP advise the project team to take next?

Options:

A.

Perform a post occupancy survey

B.

Conduct an internal performance verification

C.

Wait until 50% occupancy for performance verification

D.

Proceed with performance verification at 45% occupancy

Discussion
River
Hey, I used Cramkey Dumps to prepare for my recent exam and I passed it.
Lewis Dec 22, 2025
Yeah, I used these dumps too. And I have to say, I was really impressed with the results.
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby Dec 1, 2025
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Esmae
I highly recommend Cramkey Dumps to anyone preparing for the certification exam.
Mollie Dec 18, 2025
Absolutely. They really make it easier to study and retain all the important information. I'm so glad I found Cramkey Dumps.
Nylah
I've been looking for good study material for my upcoming certification exam. Need help.
Dolly Dec 5, 2025
Then you should definitely give Cramkey Dumps a try. They have a huge database of questions and answers, making it easy to study and prepare for the exam. And the best part is, you can be sure the information is accurate and relevant.
Question 33

A project registered under WELL Core Certification has a total area of 100.000 ft3 (9 290 m2). What is the minimum of the total building floor area that should be available tor performance testing?

A)

Questions 33

B)

Questions 33

C)

Questions 33

D)

Questions 33

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Discussion
Question 34

Which of the following references could be used for Feature L02: Visual Lighting Design, Part 1: Provide Visual Acuity?

Options:

A.

ISO 8995-1:2002

B.

AS 1668.4-2012

C.

ANSI S3.1-2018

D.

2019 CARB SCM

Discussion
Question 35

Under which of the following circumstances must projects provide a plan for reprogramming or mitigating sound transmission'?

Options:

A.

A quiet zone directly border a loud zone

B.

A mixed zone directly borders a quiet zone

C.

A loud zone directly borders o mixed zone

D.

A circulation zone directly borders a mixed zone

Discussion
Page: 8 / 15

WELL-AP
PDF

$26.25  $104.99

WELL-AP Testing Engine

$31.25  $124.99

WELL-AP PDF + Testing Engine

$41.25  $164.99