Pre-Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

USGBC Updated LEED-Green-Associate Exam Questions and Answers by arnie

Page: 8 / 20

USGBC LEED-Green-Associate Exam Overview :

Exam Name: LEED Green Associate Exam (LEED GA)
Exam Code: LEED-Green-Associate Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 303 Q&A's Shared By: arnie
Question 32

Which of the following options does the triple bottom line entail?

Options:

A.

Time, cost and quality

B.

People, planet and profit

C.

Energy, water and materials

D.

Health, safety and environment

Discussion
Question 33

A developer has asked the building designer to incorporate a landscape irrigation system using the building's graywater in order to earn LEED points. Which is the most appropriate source of graywater for this use?

Options:

A.

Urinal

B.

Toilet

C.

Janitor sink

D.

Bathroom sink

Discussion
Esmae
I highly recommend Cramkey Dumps to anyone preparing for the certification exam.
Mollie Aug 15, 2024
Absolutely. They really make it easier to study and retain all the important information. I'm so glad I found Cramkey Dumps.
Conor
I recently used these dumps for my exam and I must say, I was impressed with their authentic material.
Yunus Sep 13, 2024
Exactly…….The information in the dumps is so authentic and up-to-date. Plus, the questions are very similar to what you'll see on the actual exam. I felt confident going into the exam because I had studied using Cramkey Dumps.
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub Sep 22, 2024
That's great to hear. I am going to try them soon.
Syeda
I passed, Thank you Cramkey for your precious Dumps.
Stella Aug 25, 2024
That's great. I think I'll give Cramkey Dumps a try.
Question 34

Which impact categories have been identified as most important for a LEED project to accomplish?

Options:

A.

Increase return on investment, promote human scale development

B.

Protect biodiversity and ecosystem services, improve business efficiency

C.

Reduce contribution to climate change, enhance human health and well-being

D.

Increase return on investment, promote sustainable and regenerative material cycles

Discussion
Question 35

Which of the following processes is conducted prior to building occupancy and removes indoor airbome contaminants by thoroughly exhausting old air and replacing it with fresh outdoor air?

Options:

A.

Bake-out

B.

Flush-out

C.

Air ejection

D.

Hot box analysis

Discussion
Page: 8 / 20
Title
Questions
Posted

LEED-Green-Associate
PDF

$42  $104.99

LEED-Green-Associate Testing Engine

$50  $124.99

LEED-Green-Associate PDF + Testing Engine

$66  $164.99