Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

UiPath Updated UiPath-ARDv1 Exam Questions and Answers by viaan

Page: 10 / 12

UiPath UiPath-ARDv1 Exam Overview :

Exam Name: UiPath Advanced RPA Developer v1.0 Exam (UiARD)
Exam Code: UiPath-ARDv1 Dumps
Vendor: UiPath Certification: UiPath Certified Professional - Developer Track
Questions: 348 Q&A's Shared By: viaan
Question 40

A developer created a custom rule for Workflow Analyzer and wants to make it available only at the project level.

Which action should the developer perform?

Options:

A.

Create an external assembly (.dll) of the rule and copy it to the Studio install location.

B.

Create an external assembly (.dll) of the rule and copy it to the project location.

C.

Create a Nuget package (.nupkg) of the rule and publish it to Orchestrator.

D.

Create a Nuget package (.nupkg) of the rule and install it in a Studio project as a dependency.

Discussion
Question 41

During the development of a process, a certain label text must be retrieved. After retrieving the text, a button must be clicked and the following occurs:

1.The loading of the label text element takes longer than 30 seconds.

2.The loading of the button takes longer than 30 seconds.

3.The retrieving of the data or clicking the button must be tried until successful.

Based on UiPath best practices, what must the developer use to ensure that an error is thrown if the label text or the button element does not load?

Options:

A.

Use the Get Text activity with the default timeout and set the ContinueOnError property to "True". Use the Click activity in the Retry Scope activity.

B.

Use the Get Text activity with the default properties in a Retry Scope activity. Use the Click activity with the default properties in a Retry Scope activity.

C.

Modify the Get Text activity by increasing the timeout property. Use the Click activity to click the button with the default settings.

D.

Use the Get Text activity with the default timeout and set the WaitForReady property to "None" in a Retry Scope activity.

Modify the Click activity by increasing the timeout property and set the ContinueOnError property to "True".

Discussion
Question 42

Based on the configuration shown in the exhibit, what is the result of the execution of these activities if the target element does not exist at runtime?

Questions 42

Options:

A.

"Pop-up exists" message is logged

B.

Robot continues to look for the target element until the execution is manually stopped

C.

Execution completes successfully without logging a message

D.

Activity Timeout Exceeded error is received

Discussion
Ayra
How these dumps are necessary for passing the certification exam?
Damian Oct 22, 2024
They give you a competitive edge and help you prepare better.
Josephine
I want to ask about their study material and Customer support? Can anybody guide me?
Zayd Oct 22, 2024
Yes, the dumps or study material provided by them are authentic and up to date. They have a dedicated team to assist students and make sure they have a positive experience.
Esmae
I highly recommend Cramkey Dumps to anyone preparing for the certification exam.
Mollie Aug 15, 2024
Absolutely. They really make it easier to study and retain all the important information. I'm so glad I found Cramkey Dumps.
Ace
No problem! I highly recommend Cramkey Dumps to anyone looking to pass their certification exams. They will help you feel confident and prepared on exam day. Good luck!
Harris Oct 31, 2024
That sounds amazing. I'll definitely check them out. Thanks for the recommendation!
Question 43

Review the following exhibit:

Questions 43

Based on the exhibit, what is the result of the Write Line in the sequence?

Options:

A.

123

B.

True

C.

Hello

D.

123True

Discussion
Page: 10 / 12

UiPath-ARDv1
PDF

$42  $104.99

UiPath-ARDv1 Testing Engine

$50  $124.99

UiPath-ARDv1 PDF + Testing Engine

$66  $164.99