Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

SailPoint Updated IdentityIQ-Engineer Exam Questions and Answers by deborah

Page: 4 / 8

SailPoint IdentityIQ-Engineer Exam Overview :

Exam Name: SailPoint Certified IdentityIQ Engineer
Exam Code: IdentityIQ-Engineer Dumps
Vendor: SailPoint Certification: Identity Security Engineer
Questions: 121 Q&A's Shared By: deborah
Question 16

Can this action be performed as part of configuring an application definition in IdentitylQ?

Solution:Define account correlation via a rule.

Options:

A.

Yes

B.

No

Discussion
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari (not set)
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Carson
Yeah, definitely. I would definitely recommend Cramkey Dumps to anyone who is preparing for an exam.
Rufus (not set)
Me too. They're a lifesaver!
Nia
Why are these Dumps so important for students these days?
Mary (not set)
With the constantly changing technology and advancements in the industry, it's important for students to have access to accurate and valid study material. Cramkey Dumps provide just that. They are constantly updated to reflect the latest changes and ensure that the information is up-to-date.
Joey
I highly recommend Cramkey Dumps to anyone preparing for the certification exam. They have all the key information you need and the questions are very similar to what you'll see on the actual exam.
Dexter (not set)
Agreed. It's definitely worth checking out if you're looking for a comprehensive and reliable study resource.
Question 17

Is the following a true statement about IdentitylQ authentication and authorization?

Solution: Whatusers can see and do in IdentitylQ can be party controlled by their authorized scope.

Options:

A.

Yes

B.

No

Discussion
Question 18

How should an engineer schedule the tasks to most efficiently achieve the following goals?

Goals:

• Process the Employee Authoritative application at 5:00 AM and 12:00 PM.

• Process the Contractor Authoritative application at 5:10 AM and 12:10 PM.

• Process the Active Directory application at 5:20 AM and 12:20 PM.

• Process the Finance application at 8:00 PM.

• Check for expired work items at 12:00 AM.

• Perform identity request maintenance at 2:00 AM.

Schedule parameters:

• Each application aggregation takes anywhere between 30 minutes and 2 hours.

• The run schedule is for a 24-hour period, which begins at 12:00 AM.

Instructions:

• Drag the required tasks from the left into the answer area on the right, and place them in the correct order, starting at 12:00 AM.

• Ordinal numbers (such as 1st, 2nd, and 3rd) in the options indicate which run of the day it is for the task type.

• There will be unused task options.

Questions 18

Options:

Discussion
Question 19

Is this a correct procedure for testing generated emails in a non-production system?

Solution: Change the Email Notification Type to Redirect to file using FTP protocol under Global Settings > Configure IdentitylQ Settings > Mail Settings, run the test scenario, and verify that the email text saved to the redirected file.

Options:

A.

Yes

B.

No

Discussion
Page: 4 / 8

IdentityIQ-Engineer
PDF

$40  $99.99

IdentityIQ-Engineer Testing Engine

$48  $119.99

IdentityIQ-Engineer PDF + Testing Engine

$64  $159.99