Question 16

While mining the defect database for patterns of problems in the last release, a Test Manager notices that many of the most damaging failures were caused by defects

injected during the low-level design phase.

Which of the following actions will likely give this project the most effective solution to this problem? [3]

Options:

A.

Increased static analysis during the implementation phase

B.

Mandatory reviews of all important design work products

C.

Formal inspections of the code modules affected by the last release

D.

Increased white-box coverage during system testing

Discussion
Amy
I passed my exam and found your dumps 100% relevant to the actual exam.
Lacey May 16, 2026
Yeah, definitely. I experienced the same.
Miriam
Highly recommended Dumps. 100% authentic and reliable. Passed my exam with wonderful score.
Milan May 26, 2026
I see. Thanks for the information. I'll definitely keep Cramkey in mind for my next exam.
Ayesha
They are study materials that are designed to help students prepare for exams and certification tests. They are basically a collection of questions and answers that are likely to appear on the test.
Ayden May 7, 2026
That sounds interesting. Why are they useful? Planning this week, hopefully help me. Can you give me PDF if you have ?
Sam
Can I get help from these dumps and their support team for preparing my exam?
Audrey May 5, 2026
Definitely, you won't regret it. They've helped so many people pass their exams and I'm sure they'll help you too. Good luck with your studies!
Question 17

When, at a minimum, should project risks be re-evaluated? [1]

Options:

A.

Prior to test case creation

B.

At major project milestones

C.

During the creation of the test plan

D.

At the beginning of the test execution phase

Discussion
Question 18

You are the manager of a test team. You inherited most of these people from a previous manager who promoted technical skills, particularly

programming skills. As a result, your people are very strong in test automation skills, white box testing and complex test design

techniques. You have just been told that you can hire five new people. You want the new people to complement the existing skill sets and

you want to be sure the team will have a strong mutual respect.

Given the following options, who should you hire? [3]

Options:

A.

Hire all black box testers because you are severely lacking in that skill set.

B.

Hire customer support people who have experience with the customer interface.

C.

Hire a mix of people with strong testing and domain skills.

D.

Hire college interns who can be trained by the existing people.

Discussion
Question 19

Refer to SCENARIO 2 It has been agreed that the following test planning documents will be produced;

• A single overarching document outlining the general testing methodology for the whole programme of work

• A subordinate test plan for each of the three projects

• A separate test plan for performance testing within each project

Which one of the following options BEST describes the type of test management document that will meet the programme requirements?

Questions 19

Options:

A.

Option 2.

B.

Option 4.

C.

Option 1.

D.

Option 3.

Discussion