Black Friday Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

ISTQB Updated CT-TAE Exam Questions and Answers by bailey

Page: 3 / 5

ISTQB CT-TAE Exam Overview :

Exam Name: Certified Tester Test Automation Engineer
Exam Code: CT-TAE Dumps
Vendor: ISTQB Certification: Test Automation Engineer
Questions: 80 Q&A's Shared By: bailey
Question 12

You are testing a major enhancement to an air traffic control user interface. You have use of a sophisticated pre-production test environment, created specifically for large scale automated regression, performance and security testing. The window for regression testing is limited and

must successfully conclude, with no major regressions remaining, before the non-functional testing starts.

You have been using the same version of the TAS for the last few releases, each time completing the automated regression test suite in a single overnight run. However, due to the latest enhancements for the SUT, you believe there is a risk that the test suite may no longer complete

overnight and therefore delay performance and security testing.

Which option would be the BEST and MOST cost-efficient approach to mitigate this risk?

Options:

A.

Create a mirror of the pre-production test environment and split the regression test suite to run in parallel across the environments.

B.

Split the regression test suite into multiple parts, running in the environment across consecutive nights.

C.

Analyse the regression test suite and remove test coverage duplication and redundancy.

D.

Introduce better coding practices for the automation scripts, including coding guidelines, reviews and improved static analysis.

Discussion
Question 13

New features have been added for the current release of a SUT.

Which action would NOT be appropriate for the TAE to perform when evaluating the impact on the TAS?

Options:

A.

Gather feedback from the Business Analysts to determine if the current TAS will meet the needs of the new features.

B.

Review existing keywords to see if they need to be modified.

C.

Run existing automated tests against the updated SUT to verify and record any changes to their correct operation.

D.

Evaluate compatibility with existing test tools and, where necessary, identify alternative solutions.

Discussion
Question 14

Your company is new to test automation and as TAE. you have designed a TAS which successfully supports the SUT for the current project.

There are other systems currently in operation which have been tested manually and more systems are planned over the coming years. Based on this success, your company requires test automation be rolled out to other current and future SUTs with consistency being a key objective.

Which of the following is the BEST way to achieve that?

Options:

A.

Design a new TAS for each SUT, and manage each one through a dedicated automation support team.

B.

Install the current TAS into a central repository so that other tests on different SUTs use the same version of the TAS.

C.

Check for correct connectivity to internal and external systems to ensure that the TAS has been installed and configured correctly for each SUT.

D.

Develop a tool that keeps track of automation failures across the different SUTs and produces regular reports to stakeholders.

Discussion
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline Sep 12, 2024
Definitely! I have no doubt new students will find them to be just as helpful as I did.
River
Hey, I used Cramkey Dumps to prepare for my recent exam and I passed it.
Lewis Sep 11, 2024
Yeah, I used these dumps too. And I have to say, I was really impressed with the results.
Hassan
Highly Recommended Dumps… today I passed my exam! Same questions appear. I bought Full Access.
Kasper Oct 20, 2024
Hey wonderful….so same questions , sounds good. Planning to write this week, I will go for full access today.
Billy
It was like deja vu! I was confident going into the exam because I had already seen those questions before.
Vincent Aug 15, 2024
Definitely. And the best part is, I passed! I feel like all that hard work and preparation paid off. Cramkey is the best resource for all students!!!
Question 15

A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment. Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.

Which of the following would be the BEST way to automatically provides this report?

Options:

A.

Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds), use this database to automatically update a dashboard containing the build history and test results accessible to the project team.

B.

Store the execution result of the integration tests for the last build to a database (overwriting the results from the previous build), automatically create a test execution report for this build send It via e-mail to the project team

C.

Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds). Automatically create a test execution report for this build and send it via e-mail to the project team

D.

Store the code coverage results of the integration tests for the last build to a database (without overwriting the results from the previous builds). And automatically create a chart showing the trend in code coverage and send via email to the project team.

Discussion
Page: 3 / 5

CT-TAE
PDF

$36.75  $104.99

CT-TAE Testing Engine

$43.75  $124.99

CT-TAE PDF + Testing Engine

$57.75  $164.99