New Year Special 75% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 75brite

ISTQB Updated CT-TAE Exam Questions and Answers by bailey

Page: 3 / 5

ISTQB CT-TAE Exam Overview :

Exam Name: Certified Tester Test Automation Engineer
Exam Code: CT-TAE Dumps
Vendor: ISTQB Certification: Test Automation Engineer
Questions: 80 Q&A's Shared By: bailey
Question 12

You are testing a major enhancement to an air traffic control user interface. You have use of a sophisticated pre-production test environment, created specifically for large scale automated regression, performance and security testing. The window for regression testing is limited and

must successfully conclude, with no major regressions remaining, before the non-functional testing starts.

You have been using the same version of the TAS for the last few releases, each time completing the automated regression test suite in a single overnight run. However, due to the latest enhancements for the SUT, you believe there is a risk that the test suite may no longer complete

overnight and therefore delay performance and security testing.

Which option would be the BEST and MOST cost-efficient approach to mitigate this risk?

Options:

A.

Create a mirror of the pre-production test environment and split the regression test suite to run in parallel across the environments.

B.

Split the regression test suite into multiple parts, running in the environment across consecutive nights.

C.

Analyse the regression test suite and remove test coverage duplication and redundancy.

D.

Introduce better coding practices for the automation scripts, including coding guidelines, reviews and improved static analysis.

Discussion
Question 13

New features have been added for the current release of a SUT.

Which action would NOT be appropriate for the TAE to perform when evaluating the impact on the TAS?

Options:

A.

Gather feedback from the Business Analysts to determine if the current TAS will meet the needs of the new features.

B.

Review existing keywords to see if they need to be modified.

C.

Run existing automated tests against the updated SUT to verify and record any changes to their correct operation.

D.

Evaluate compatibility with existing test tools and, where necessary, identify alternative solutions.

Discussion
Question 14

Your company is new to test automation and as TAE. you have designed a TAS which successfully supports the SUT for the current project.

There are other systems currently in operation which have been tested manually and more systems are planned over the coming years. Based on this success, your company requires test automation be rolled out to other current and future SUTs with consistency being a key objective.

Which of the following is the BEST way to achieve that?

Options:

A.

Design a new TAS for each SUT, and manage each one through a dedicated automation support team.

B.

Install the current TAS into a central repository so that other tests on different SUTs use the same version of the TAS.

C.

Check for correct connectivity to internal and external systems to ensure that the TAS has been installed and configured correctly for each SUT.

D.

Develop a tool that keeps track of automation failures across the different SUTs and produces regular reports to stakeholders.

Discussion
Question 15

A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment. Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.

Which of the following would be the BEST way to automatically provides this report?

Options:

A.

Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds), use this database to automatically update a dashboard containing the build history and test results accessible to the project team.

B.

Store the execution result of the integration tests for the last build to a database (overwriting the results from the previous build), automatically create a test execution report for this build send It via e-mail to the project team

C.

Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds). Automatically create a test execution report for this build and send it via e-mail to the project team

D.

Store the code coverage results of the integration tests for the last build to a database (without overwriting the results from the previous builds). And automatically create a chart showing the trend in code coverage and send via email to the project team.

Discussion
Victoria
Hey, guess what? I passed the certification exam! I couldn't have done it without Cramkey Dumps.
Isabel Dec 28, 2025
Same here! I was so surprised when I saw that almost all the questions on the exam were exactly what I found in their study materials.
Amy
I passed my exam and found your dumps 100% relevant to the actual exam.
Lacey Dec 19, 2025
Yeah, definitely. I experienced the same.
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari Dec 18, 2025
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Aryan
Absolutely rocked! They are an excellent investment for anyone who wants to pass the exam on the first try. They save you time and effort by providing a comprehensive overview of the exam content, and they give you a competitive edge by giving you access to the latest information. So, I definitely recommend them to new students.
Jessie Dec 18, 2025
did you use PDF or Engine? Which one is most useful?
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Dec 10, 2025
Good point. Thanks for the advice. I'll definitely keep that in mind.
Page: 3 / 5

CT-TAE
PDF

$26.25  $104.99

CT-TAE Testing Engine

$31.25  $124.99

CT-TAE PDF + Testing Engine

$41.25  $164.99