Exam Name: | HCIP-Datacom-Advanced Routing & Switching Technology V1.0 | ||
Exam Code: | H12-831_V1.0 Dumps | ||
Vendor: | Huawei | Certification: | HCIP-Datacom |
Questions: | 266 Q&A's | Shared By: | thiago |
The rollback operation of project cutover can be temporarily determined according to the situation during cutover, and no advance plan is required.
There is the concept of forwarding equivalence class FEC in MPLS. The following description is wrong: