Month End Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Huawei Updated H19-371_V1.0 Exam Questions and Answers by naia

Page: 17 / 24

Huawei H19-371_V1.0 Exam Overview :

Exam Name: HCS-Pre-sales-Digital Power V1.0
Exam Code: H19-371_V1.0 Dumps
Vendor: Huawei Certification: HCS-Pre-sales
Questions: 653 Q&A's Shared By: naia
Question 68

The input power factor (full load) of UPS5000-A is ( ), which can effectively reduce the pollution to the power grid and reduce the investment in front-end power distribution

Options:

A.

1.

B.

>0.99

C.

>0.98

Discussion
Hassan
Highly Recommended Dumps… today I passed my exam! Same questions appear. I bought Full Access.
Kasper Oct 20, 2024
Hey wonderful….so same questions , sounds good. Planning to write this week, I will go for full access today.
Melody
My experience with Cramkey was great! I was surprised to see that many of the questions in my exam appeared in the Cramkey dumps.
Colby Aug 17, 2024
Yes, In fact, I got a score of above 85%. And I attribute a lot of my success to Cramkey's dumps.
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari Sep 1, 2024
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Josie
I just passed my certification exam using their dumps and I must say, I was thoroughly impressed.
Fatimah Oct 24, 2024
You’re right. The dumps were authentic and covered all the important topics. I felt confident going into the exam and it paid off.
Question 69

Relevant standards stipulate that the voltage drop of the AC cable needs to be controlled within 3%, and it is recommended that the voltage drop of the AC power edge be controlled within ( ) when designing the UPS system. /

Options:

A.

0.01

B.

0.02

C.

0.03

D.

0.05

Discussion
Question 70

Huawei Technologies Co., Ltd. is GB50174-2008 standard and GB50174-2017 standard

Options:

A.

Participating units, participating units

B.

Participating units, auditing units

C.

audit unit, audit unit

D.

Review unit, participating unit

Discussion
Question 71

2GUPSS000-E (50kVA power module) 150kVA, rack 1+1 redundancy, total input power distribution cabinet, the required total input switch is ( ). /

Options:

A.

250A

B.

320A

C.

500A

D.

630A

Discussion
Page: 17 / 24
Title
Questions
Posted

H19-371_V1.0
PDF

$36.75  $104.99

H19-371_V1.0 Testing Engine

$43.75  $124.99

H19-371_V1.0 PDF + Testing Engine

$57.75  $164.99