Huawei H19-371_V1.0 Exam Overview :

Exam Name: HCS-Pre-sales-Digital Power V1.0
Exam Code: H19-371_V1.0 Dumps
Vendor: Huawei Certification: HCS-Pre-sales
Questions: 653 Q&A's Shared By: naia
Question 68

The input power factor (full load) of UPS5000-A is ( ), which can effectively reduce the pollution to the power grid and reduce the investment in front-end power distribution

Options:

A.

1.

B.

>0.99

C.

>0.98

Discussion
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline Sep 12, 2024
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Alessia
Amazing Dumps. Found almost all questions in actual exam whih I prepared from these valuable dumps. Recommended!!!!
Belle Nov 2, 2024
That's impressive. I've been struggling with finding good study material for my certification. Maybe I should give Cramkey Dumps a try.
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Oct 25, 2024
Good point. Thanks for the advice. I'll definitely keep that in mind.
Yusra
I passed my exam. Cramkey Dumps provides detailed explanations for each question and answer, so you can understand the concepts better.
Alisha Aug 29, 2024
I recently used their dumps for the certification exam I took and I have to say, I was really impressed.
Question 69

Relevant standards stipulate that the voltage drop of the AC cable needs to be controlled within 3%, and it is recommended that the voltage drop of the AC power edge be controlled within ( ) when designing the UPS system. /

Options:

A.

0.01

B.

0.02

C.

0.03

D.

0.05

Discussion
Question 70

Huawei Technologies Co., Ltd. is GB50174-2008 standard and GB50174-2017 standard

Options:

A.

Participating units, participating units

B.

Participating units, auditing units

C.

audit unit, audit unit

D.

Review unit, participating unit

Discussion
Question 71

2GUPSS000-E (50kVA power module) 150kVA, rack 1+1 redundancy, total input power distribution cabinet, the required total input switch is ( ). /

Options:

A.

250A

B.

320A

C.

500A

D.

630A

Discussion
Page: 17 / 24
Title
Questions
Posted

H19-371_V1.0
PDF

$36.75  $104.99

H19-371_V1.0 Testing Engine

$43.75  $124.99

H19-371_V1.0 PDF + Testing Engine

$57.75  $164.99