Exam Name: | Building HPE Hybrid IT Solutions (Rev. 19.41) | ||
Exam Code: | HPE0-V14 Dumps | ||
Vendor: | HP | Certification: | HPE ATP - Hybrid IT Solutions V2 |
Questions: | 303 Q&A's | Shared By: | aasiyah |
A customer is moving a server from a co-location facility back into their existing data center to comply with new internal policies on data management
Due to budget constraints, the customer cannot purchase any additional switches and will need to use an existing end-of-row design with HPE FlexFabric switches While the server will be installed six racks away from the switches, the total cable run with cable management Is expected to be 35 m.
Which component should be selected when designing the 10 Gbps connectivity option for the server?
A customer with limited IT administration resources needs a complete HPE server, storage, and networking solution. The solution must be able to be deployed in an hour or less through a simple, wizard-based setup. They want to manage the HPE solution through a simple, integrated plug-in to vCenter, since their IT staff members are already familiar with vCenter.
Which HPE solution best meets the customer requirements?
What is an access port on an Ethernet switch?
A customer’s environment includes virtual machines and containers. They need an on-premises platform that allows them to easily and efficiently deploy cloud-native applications at rack-scale.
Which HPE solution meets the customer requirements?