Weekend Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

GAQM Updated CLSSBB Exam Questions and Answers by advik

Page: 7 / 13

GAQM CLSSBB Exam Overview :

Exam Name: Certified Lean Six Sigma Black Belt (CLSSBB)
Exam Code: CLSSBB Dumps
Vendor: GAQM Certification: Lean Six Sigma Black Belt Certification
Questions: 357 Q&A's Shared By: advik
Question 28

A machine tool vender wants to sell an injection molding machine. The current machine produces 3.2% defectives. A sample of 1100 from the vender’s machine has 2.9% defective. Do these numbers indicate that the proposed machine has a lower rate of defectives?

Options:

A.

yes

B.

no

Discussion
Neve
Will I be able to achieve success after using these dumps?
Rohan Oct 24, 2024
Absolutely. It's a great way to increase your chances of success.
Ayra
How these dumps are necessary for passing the certification exam?
Damian Oct 22, 2024
They give you a competitive edge and help you prepare better.
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub Sep 22, 2024
That's great to hear. I am going to try them soon.
Vienna
I highly recommend them. They are offering exact questions that we need to prepare our exam.
Jensen Oct 9, 2024
That's great. I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Question 29

After a team has engaged in diversion activities they may need to employ a tool for conversion. Examples of such a tool are:

I. nominal group technique

II. Multivoting

III. cause and effect diagram

IV. activity network diagram

V. matrix diagrams

Options:

A.

III and IV

B.

IV and V

C.

II and III

D.

I and II

Discussion
Question 30

The primary metric for a project is reduced cost for process A .A consequential metric could be:

Options:

A.

reduced cycle time

B.

reduced scrap rate

C.

reduced set-up time

D.

all the above

E.

none of the above

Discussion
Question 31

A team is investigating ways to reduce power outages. They determine that an outage can occur in only three ways: grid failure, local transformer failure or local overload. They then investigate each of these three events for possible causes, etc. They draw a diagram that “fans out” using the power outage as the handle of the fan.

These improvements are best described by which approach to problem solving?

Options:

A.

Affinity diagram

B.

Inter-relationship digraph

C.

Tree diagram

D.

Process decision program chart

E.

Matrix diagram F. Prioritization matrix

F.

Activity network diagram

Discussion
Page: 7 / 13

CLSSBB
PDF

$36.75  $104.99

CLSSBB Testing Engine

$43.75  $124.99

CLSSBB PDF + Testing Engine

$57.75  $164.99