Exam Name: | Certified Lean Six Sigma Black Belt (CLSSBB) | ||
Exam Code: | CLSSBB Dumps | ||
Vendor: | GAQM | Certification: | Lean Six Sigma Black Belt Certification |
Questions: | 227 Q&A's | Shared By: | advik |
A machine tool vender wants to sell an injection molding machine. The current machine produces 3.2% defectives. A sample of 1100 from the vender’s machine has 2.9% defective. Do these numbers indicate that the proposed machine has a lower rate of defectives?
After a team has engaged in diversion activities they may need to employ a tool for conversion. Examples of such a tool are:
I. nominal group technique
II. Multivoting
III. cause and effect diagram
IV. activity network diagram
V. matrix diagrams
The primary metric for a project is reduced cost for process A .A consequential metric could be:
A team is investigating ways to reduce power outages. They determine that an outage can occur in only three ways: grid failure, local transformer failure or local overload. They then investigate each of these three events for possible causes, etc. They draw a diagram that “fans out” using the power outage as the handle of the fan.
These improvements are best described by which approach to problem solving?