Black Friday Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Exin Updated CDCP Exam Questions and Answers by ren

Page: 4 / 5

Exin CDCP Exam Overview :

Exam Name: Certified Data Centre Professional (CDCP)
Exam Code: CDCP Dumps
Vendor: Exin Certification: EPI Data Centre
Questions: 73 Q&A's Shared By: ren
Question 16

The UPS vendor is offering the latest model of their UPS to you. The vendor indicates that the UPS is categorized as VFD class.

Is this UPS a fit for your mission-critical data centre?

Options:

A.

Yes

B.

No

C.

Yes, but only if you oversize the battery bank with 10%.

D.

Yes, but only if they install it with a 12-pulse rectifier.

Discussion
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari Sep 1, 2024
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Miley
Hey, I tried Cramkey Dumps for my IT certification exam. They are really awesome and helped me pass my exam with wonderful score.
Megan Aug 30, 2024
That’s great!!! I’ll definitely give it a try. Thanks!!!
Ivan
I tried these dumps for my recent certification exam and I found it pretty helpful.
Elis Sep 17, 2024
Agree!!! The questions in the dumps were quite similar to what came up in the actual exam. It gave me a good idea of the types of questions to expect and helped me revise efficiently.
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline Sep 12, 2024
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Question 17

Which type of copper wire is used for grounding the racks to the SRG?

Options:

A.

Thin copper cable to keep the cost low for grounding.

B.

Thick copper cable to create better grounding.

C.

Braided copper wire or flat copper strip.

D.

Copper cable with plastic insulation (isolation).

Discussion
Question 18

Which one of the following is the last stage in Stages of Combustion?

Options:

A.

Visible Smoke

B.

Intense Heat

C.

Incipient

D.

Flaming Fire

Discussion
Question 19

What is the main advantage of busbar trunking compared to stand electrical cabling?

Options:

A.

Busbar trunking is less expensive.

B.

Busbar trunking has a fixed power rating.

C.

Busbar trunking allows for flexibility.

D.

Busbar trunking can be located both overhead and under the raised floor.

Discussion
Page: 4 / 5

CDCP
PDF

$36.75  $104.99

CDCP Testing Engine

$43.75  $124.99

CDCP PDF + Testing Engine

$57.75  $164.99