Question 28

What is the expected life cycle, in years, of building automation system within a building structure with a life cycle of 40+ years?

Options:

A.

1 to 2

B.

2 to 4

C.

5 to 7

D.

8 to 12

E.

12 to 15

Discussion
Question 29

Which of the following protocols is referred to under ISO 16484-5?

Options:

A.

BACnet

B.

ARCnet

C.

European installation bus

D.

EMSLan

E.

LonMark

Discussion
Josie
I just passed my certification exam using their dumps and I must say, I was thoroughly impressed.
Fatimah Oct 24, 2024
You’re right. The dumps were authentic and covered all the important topics. I felt confident going into the exam and it paid off.
Miriam
Highly recommended Dumps. 100% authentic and reliable. Passed my exam with wonderful score.
Milan Sep 24, 2024
I see. Thanks for the information. I'll definitely keep Cramkey in mind for my next exam.
Ace
No problem! I highly recommend Cramkey Dumps to anyone looking to pass their certification exams. They will help you feel confident and prepared on exam day. Good luck!
Harris Oct 31, 2024
That sounds amazing. I'll definitely check them out. Thanks for the recommendation!
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Oct 29, 2024
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Question 30

If you are using a building automation system (BAS) protocol operating on RF media at 19,200 b/s in the 868 MHz band, which protocol are you using?

Options:

A.

European installation bus

B.

Lon Talk

C.

MODBUS

D.

LonMark

E.

Modicon

Discussion
Question 31

You are placing two 423 mm (19 in) relay racks with a 152 mm (6 in) vertical management panel on each end and a 12 in vertical cable management panel between the racks. The rack lineup begins against a wall in the room. What is the MINIMUM room size required?

Options:

A.

1.83 m (6 ft) x 2.4 m (8 ft)

B.

2.1 m (7 ft) x 2.4 m (8 ft)

C.

2.4 m (8 ft) x 2.4 m (8 ft)

D.

2.4 m (8 ft) x 3.0 m (10 ft)

E.

3.0 m (10 ft) x 3.0 m (10 ft)