Black Friday Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Page: 1 / 1

Servers Dell PowerEdge XE9680 and XE8640 Install

Dell PowerEdge XE9680 and XE8640 Install

Last Update Nov 22, 2024
Total Questions : 14

To help you prepare for the D-PEXE-IN-A-00 EMC exam, we are offering free D-PEXE-IN-A-00 EMC exam questions. All you need to do is sign up, provide your details, and prepare with the free D-PEXE-IN-A-00 practice questions. Once you have done that, you will have access to the entire pool of Dell PowerEdge XE9680 and XE8640 Install D-PEXE-IN-A-00 test questions which will help you better prepare for the exam. Additionally, you can also find a range of Dell PowerEdge XE9680 and XE8640 Install resources online to help you better understand the topics covered on the exam, such as Dell PowerEdge XE9680 and XE8640 Install D-PEXE-IN-A-00 video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic EMC D-PEXE-IN-A-00 exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 2

What must be considered regarding stab-in rails with installing a PowerEdge XE server?

Options:

A.  

Enable a vertical installation of the server with the use of J-slots.

B.  

Do not support extending the server from the rack.

C.  

Only used in 4-post, square hole racks.

D.  

Inner rail must be installed on the server before installing in rack.

Discussion 0
Questions 3

A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables that route to switches in the data center. The administrator questions the use of a cablemanagement arm (CMA).

What are two items to consider when installing a CMA?

Options:

A.  

The CMA can be installed to open on either the left or right side of the server.

B.  

Do not route optical cables through the CMA.

C.  

A CMA can only be installed with a strain relief bar.

D.  

The XE9680 does not support a CMA.

Discussion 0
Questions 4

What is the sequence of steps to install an XE9680 server in a new rack.

Questions 4

Options:

Discussion 0

D-PEXE-IN-A-00
PDF

$36.75  $104.99

D-PEXE-IN-A-00 Testing Engine

$43.75  $124.99

D-PEXE-IN-A-00 PDF + Testing Engine

$57.75  $164.99