To help you prepare for the TM12 BCS exam, we are offering free TM12 BCS exam questions. All you need to do is sign up, provide your details, and prepare with the free TM12 practice questions. Once you have done that, you will have access to the entire pool of ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) TM12 test questions which will help you better prepare for the exam. Additionally, you can also find a range of ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) resources online to help you better understand the topics covered on the exam, such as ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) TM12 video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic BCS TM12 exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.
Test Management
Which of the following statements, about the test reporting activities for a project adopting an iterative lifecycle model with very short iterations (e.g. two weeks iterations), is correct?
Number of correct responses: 1
K21 credit
Reviews
Consider the following list of statements about audits and management reviews:
I.Audits are usually more effective than management reviews at finding defects
II. Audits and management reviews have the same main goals, the only difference is related to the roles and level of formality
III. A typical outcome of an audit includes observations and recommendations, corrective actions and a pass/fail assessment
IV. An audit is not the appropriate mechanism to use at the code review in order to detect defects prior to dynamic testing
Which of the following statements is true?
Number of correct responses: 1
K21 credit
Reviews
You are the Test Manager of a project that adopts a V-model with four formal levels of testing: unit, integration, system and acceptance testing.
On this project reviews have been conducted for each development phase prior to testing, which is to say that reviews of requirements, functional specification, high-level design, low-level design and code have been performed prior to testing.
Assume that no requirements defects have been reported after the release of the product.
Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of phase containment effectiveness?
Number of correct responses: 2
K32 credits
Improving the Testing Process
Which of the following statements about the STEP test process improvement model is true?
Number of correctresponses: 1