Weekend Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Page: 1 / 1

Test Automation Engineering ISTQB Certified Tester Advanced Level-Test Automation Engineering

ISTQB Certified Tester Advanced Level-Test Automation Engineering

Last Update Feb 24, 2025
Total Questions : 40

To help you prepare for the TAE BCS exam, we are offering free TAE BCS exam questions. All you need to do is sign up, provide your details, and prepare with the free TAE practice questions. Once you have done that, you will have access to the entire pool of ISTQB Certified Tester Advanced Level-Test Automation Engineering TAE test questions which will help you better prepare for the exam. Additionally, you can also find a range of ISTQB Certified Tester Advanced Level-Test Automation Engineering resources online to help you better understand the topics covered on the exam, such as ISTQB Certified Tester Advanced Level-Test Automation Engineering TAE video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic BCS TAE exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 2

Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?

Options:

A.  

All the interaction between SUT and TAS should belogged with the highest level of detail

B.  

All the internal test interfaces of the SUT should be removed prior to the product release

C.  

All the interface of the SUT affected by the tests should be controllable by the TAA

D.  

All the external test interfaces of the SUT should be removed prior to the product release

Discussion 0
Questions 3

Which of the following success factors for a test automation project is TRUE?

Options:

A.  

Automated tests must be designed to capture only the datathat is strictly needed for comparing expected and actual results

B.  

The test cases to be automated first must always be selected based on the number of times a test will need to be run

C.  

The test cases to be automated must have a high dependency on particular data values

D.  

Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite

Discussion 0
Questions 4

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately afterthe abnormal occurred when executing the 11thtest?

Options:

A.  

Re-run the test automation suite starting from the 12thtest

B.  

Return the database to a consistent state that allows subsequent test to run

C.  

Take a backup of the database in its current state. So It can be analyzed later

D.  

Re-run the test automation suite starting from the 1sttest.

Discussion 0
Questions 5

A regression test suite consist of 500 test cases which are allexecuted manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lastedone month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.

Which of the following statements is TRUE in this scenario?

Options:

A.  

Theduration of the pilot project was too short –it should last unit the success factors are achieved

B.  

The target defined for the business case is too accurate –it should not be measureable

C.  

The project selected for the pilot is too critical –if should not be too critical or too trivial

D.  

The target defined for the business case seems difficult to hit – it should be realistic

Discussion 0
Hassan
Highly Recommended Dumps… today I passed my exam! Same questions appear. I bought Full Access.
Kasper Oct 20, 2024
Hey wonderful….so same questions , sounds good. Planning to write this week, I will go for full access today.
Wyatt
Passed my exam… Thank you so much for your excellent Exam Dumps.
Arjun Sep 18, 2024
That sounds really useful. I'll definitely check it out.
Walter
Yayyy!!! I passed my exam with the help of Cramkey Dumps. Highly appreciated!!!!
Angus Nov 4, 2024
YES….. I saw the same questions in the exam.
Nell
Are these dumps reliable?
Ernie Oct 10, 2024
Yes, very much so. Cramkey Dumps are created by experienced and certified professionals who have gone through the exams themselves. They understand the importance of providing accurate and relevant information to help you succeed.
Hendrix
Great website with Great Exam Dumps. Just passed my exam today.
Luka Aug 31, 2024
Absolutely. Cramkey Dumps only provides the latest and most updated exam questions and answers.

TAE
PDF

$36.75  $104.99

TAE Testing Engine

$43.75  $124.99

TAE PDF + Testing Engine

$57.75  $164.99